|
1 |
Introductions |
|
|
2 |
Minutes from November 28, 2000 meeting |
|
|
3 |
EFEE Report on MD Vehicles
|
|
a |
This item will be continued – no written report has been
circulated
|
|
|
4 |
Status report on ARB verification/certification for retrofit
and fuel technologies
|
| |
a |
Report by Ceryx on status of certification
|
| |
b |
Report by Lubrizol or representative on PuriNOx certification
|
|
|
5 |
Review and Recommendations of Applications subsequent to the
November 28, 2000 TAC meeting.
|
| |
a |
We have
received only one applications which exceeds the “fast track”
criteria subsequent to the November 28th, 2001 meeting, an
application from Waste Management for 14 natural gas refuse
trucks.
|
| |
b |
All
other applications received have met the “fast track” criteria
and have been processed by staff. |
|
|
6 |
Other Issues
|
|
| The SACOG Building is accessible to the
disabled. To arrange for interpreters and/or equipment for persons who are
deaf, hearing impaired or hard of hearing, please call (916) 457-2264 at least
48 hours prior to the meeting. TDD Access 737-1718.
|
|
| Please do not park in the "Natural Foods Co-op" parking lot
adjacent to the SACOG building.
Light
rail (29th Street station) and
buses
(Routes 15, 38, 67, 68) are easily accessible to SACOG, and
bicycle lanes exist on Alhambra Blvd. and T Street.
Bicycle parking is located in front of the SACOG building. |
|